Google review
“Incredibly professional and would highly recommend!”
Controlled demolition and complete strip-out services for commercial and industrial properties. From selective demolition to full building demolition, delivered with precision and safety.
PCL Limited delivers professional demolition services for structures of all sizes. Whether you need complete building demolition, selective structural removal, or interior strip-out, we provide safe, efficient solutions.
Our experienced team uses modern plant and equipment to execute controlled demolition projects. We work to minimise dust, noise, and vibration while maximising material recovery for recycling and reuse.
Every demolition project begins with thorough structural assessment and detailed planning. We coordinate utility disconnections, implement comprehensive safety measures, and ensure neighbouring properties remain fully protected throughout the works.

We achieve over 90% waste diversion through on-site crushing, material segregation, and partnerships with licensed recycling facilities.
A structured approach to controlled demolition ensuring safety, environmental responsibility, and efficient project delivery.
Comprehensive structural survey and utility mapping. We assess building condition, identify hazards, and plan safe demolition sequencing.
Detailed demolition method statement with risk assessments. We plan access routes, exclusion zones, and dust suppression measures.
Complete removal of non-structural elements, fixtures, and hazardous materials. All soft strip waste is segregated for recycling.
Systematic structural demolition using appropriate plant and machinery. Continuous monitoring ensures neighbouring properties remain protected.
On-site crushing and segregation for maximum recycling. Final site clearance leaves a clean, level surface ready for redevelopment.
Comprehensive demolition services tailored to your project requirements:
All demolition works are conducted under strict CDM regulations with comprehensive risk assessments and method statements. Our team holds CSCS cards and CPCS plant operator qualifications.
We implement full exclusion zones, dust suppression systems, and vibration monitoring to protect neighbouring properties. All works are coordinated with local authorities and utility companies.
Our demolition projects maintain excellent environmental performance through maximised recycling, proper waste classification, and licensed disposal of any hazardous materials encountered.
Practical questions on demolition, strip-out, controls, and how we plan work around your site.
Strip out usually removes finishes, M&E, and non-structural elements while retaining the frame or shell. Full demolition removes the structure to agreed levels, often with utilities isolated and neighbouring properties protected. We scope the right option for your site.
We agree limits and monitoring with you and the local authority where required, then implement suppression, screening, sequencing, and, where appropriate, vibration monitoring so impacts stay within agreed parameters.
Yes, where structurally viable. We work from engineer-approved retention schemes, temporary works, and sequenced demolition so retained elements and neighbours remain protected.
We prepare or contribute to pre-demolition information, method statements, and risk assessments under CDM, aligned with your principal designer and principal contractor where applicable.
We segregate materials for reuse and recycling where practical, with remaining arisings routed through licensed carriers and disposal sites, supported by waste transfer notes and reporting.
Best practice and HSE guidance expect a suitable survey where asbestos could be disturbed during demolition. We review what you hold and advise on gaps, then align removal or encapsulation with the demolition sequence so the site stays lawful and controlled.
We stop the affected area, reassess, and notify you immediately. The site is secured with revised controls until any additional testing, removal, or engineered solution is agreed, with all changes recorded in the site file.
Yes. Propping, retention schemes, and crane or plant foundations are designed by suitable engineers, installed under inspection regimes, and struck only when sign-off criteria are met.
5.0 from 8 Google reviews
Plus client testimonials below. Not all reviews appear on Google.
Read on GoogleGoogle review
“Incredibly professional and would highly recommend!”
“I have worked with Darren and his team at various points over the last 10 years and have had nothing but excellent service.”
“Refurbishment Works and alterations to the Fire Station at Hatfield. Including changes to room layouts, M&E works to welfare areas, and changes to the Fire Strategy provision”
“Asbestos removal bedded in the floor screed. Pier were excellent from start to finish if only all trades shared Pier’s ethos”
“Removing old plaster and cement from the top of the building, repairing, replacing and treating the front of the building ensuring it’s safe for year to come. Pier Team were polite, friendly, communicative and took the very best care in their work”
“Quick turn around and very helpful troubleshooting on a project with multiple issues. Very professional with a can-do attitude where nothing was too much trouble”
“An enormous THANK YOU! To everyone involved in particular to Alfonso who answered this phone so early and got his team here by 8.10am. Anytime we have any dealings with HCC asbestos team and Pier, we walk away feeling so very grateful by how kind, supporting and professional you all are.”
“From start to finish all those involved with PCL were amazing. Concise communications by phone and in person. Contractors arrived on site fully briefed and the task and absolutely no drama at all. All very professional, speedy and went the extra mile.”
“The man was fantastic, he was friendly, professional, always included us and communicated well, very good health and safety. We were very happy with his work. He worked often alongside the electricians who were also great help too. I would fully recommend these contractors.”
“Thank you for a prompt response, good workmanship and communication throughout. We are very grateful.”
“Really grateful, have all been supportive, professional and completed works to a high standard!”
“Pier Contractors Limited carried out multi-faceted works at two Hertfordshire schools where reinforced autoclaved aerated concrete roof planks has been identified. The works consisted of Identification of RAAC and asbestos containing materials, Asbestos removal and Design of RAAC support structure followed by the works. The project was carried out under intense scrutiny to tight deadlines, Pier worked to a high standard, communicating throughout with the client and the end users. The project was successfully delivered on time and to budget while responding to changes in the specification as the project progressed.”
Get in touch with our demolition specialists for a site assessment and detailed project proposal.